SITE LOCATION: |
Birmingham, AL – Railroad facility |
CONTAMINATION: |
LNAPL – multiple (discontinuous) gasoline/diesel fuel plumes within an 8+ acre area |
HYDROGEOLOGY: |
Groundwater at 15 to 20 feet bgs contained within a plastic clay (residuum) located on top of bedrock (dolomite) |
EFR® EFFECTIVENESS: |
Two 8-hour EFR® events were conducted in June 2010, recovering 357 gallons of diesel, as compared to 515 gallons of diesel fuel/year recovered from the pump and treat system in operation at the site. Two days of EFR® recovered 69% of the annual recovery of the pump & treat system |